Add to homescreen
If you want to add this app to home screen tap and then ‘Add to Home Screen’.
Content name
Select existing category:
Content name
New collection
Edit collection
Published on 22/03/23
777 Views
A reactor was bypassed for a longer period without draining the isocyanate solution. Steam leaked through a closed control valve to the reactor jacket. The reactor temperature raised, and the remaining material started to polymerize resulting in high pressure and plugs.
Ask yourself and your crew:
- How can something like this happen here (e.g. on our site)?
- What safety measures (i.e. procedures, controls/barriers) do we have in place to mitigate the risk?
- How do we know the risk controls/barriers are working?
- What improvements or changes should we make to the procedures, controls/barriers or the way we work?
Original material courtesy of the European Process Safety Centre